DIAMOND SPRINGS-EL DORADO FIRE PROTECTION DISTRICT
Standard Company Evolution
Number:  902
Subject:  Preconnected Liveline
Revision Date: 
Date:  1/27/93


[ index ]

Company Size: 2

Personnel: #1 (Officer) ________________________________________

#2 (Apparatus Operator) _____________________________

Company #: _____ Shift: _____ Date: _____

OBJECTIVE Two person engine company will place one 1¾" liveline into service 150 feet from position of engine placement.

Time Limit: 2:15 minutes Completed in: _______________________

Evaluator: ________________________________

Given: Company members will perform the evolution in a safe manner from a spot on relatively level ground. Personnel will wear full protective clothing and don SCBA as part of the evolution. Time begins when brake is set.

PROCEDURES

1. Member #1 makes size-up, gives directions and reports on conditions as the engine is spotted and brake is set.

Yes _____ No _____ Comments _______________________________

2. Member #2 spots the engine and properly places pump in gear.

Yes _____ No _____ Comments _______________________________

3. Both members exit engine in safe, unhurried manner.

Yes _____ No _____ Comments _______________________________

4. Member #1 dons SCBA to standard.

Yes _____ No _____ Comments _______________________________

5. Member #2 extends liveline out of the transverse bay so that all hose folds are clear of the bay.

Yes _____ No _____ Comments _______________________________

6. Member #1 extends nozzle to a point 150' from engine.

Yes _____ No _____ Comments _______________________________

7. Member #2 dons SCBA to standard.

Yes _____ No _____ Comments _______________________________

8. Member #2 charges liveline at Member #1's signal.

Yes _____ No _____ Comments _______________________________

9. Member #2 walks to Member #1's position to assist footing the hose line.

Yes _____ No _____ Comments _______________________________

10. Water is discharged from the liveline by Member #1 after Member #2 arrives and foots the hose line. Time ends at this point.

Yes _____ No _____ Comments _______________________________

UNTIMED REQUIREMENTS

1. Line is secured and engine placed back in service properly and safely.

Yes _____ No _____ Comments _______________________________

home ] [ index ] [ return to top ]